HW News - FCC Forced to Release Server Logs, NVIDIA 5nm & AMD 5nm, RTX Ampere, Ryzen Pro 4000
Before beginning this week's hardware news recap, we'd like to highlight for our readers -- or those who just prefer referencing our articles rather than scrubbing through videos at a later date -- that we've been making a bigger push to publish written content to the site lately. This site serves almost more as an archive for the scripts than anything else these days, just because the nature of maintaining it is very difficult given our current working hours, but we like it and we know that all of you like the written format. We've made an active effort in increasing how many of our videos (from YouTube) end up on the website in written form, so we published the AMD Ryzen 3 3100 review, Ryzen 3 3300X review, and our B550 vs. X570 (et al) chipset comparison. Check them out on the home page.
In the meantime, we've got a lot of hardware news for the week to recap: The FCC is being forced to reveal its server logs for concerns stemming from fake comments about net neutrality, NVIDIA and AMD are vying over 5nm supply from fab TSMC, RTX Ampere is getting an announcement this week, Intel Alder Lake and LGA1700 are in the rumor mill, and more.
GDDR6 Slated for Next-Gen nVidia GPUs, Mass Production in 3 Months
At GTC 2018, we learned that SK Hynix’s GDDR6 memory is bound for mass production in 3 months, and will be featured on several upcoming nVidia products. Some of these include autonomous vehicle components, but we also learned that we should expect GDDR6 on most, if not all, of nVidia’s upcoming gaming architecture cards.
Given a mass production timeline of June-July for GDDR6 from SK Hynix, assuming Hynix is a launch-day memory provider, we can expect next-generation GPUs to become available after this timeframe. There still needs to be enough time to mount the memory to the boards, after all. We don’t have a hard date for when the next-generation GPU lineup will ship, but from this information, we can assume it’s at least 3 months away -- possibly more. Basically, what we know is that, assuming Hynix is a launch vendor, new GPUs are nebulously >3 months away.
The latest Ask GN brings us to episode #70. We’ve been running this series for a few years now, but the questions remain top-notch. For this past week, viewers asked about nVidia’s “Ampere” and “Turing” architectures – or the rumored ones, anyway – and what we know of the naming. For other core component questions, Raven Ridge received a quick note on out-of-box motherboard support and BIOS flashing.
Non-core questions pertained to cooling, like the “best” CLCs when normalizing for fans, or hybrid-cooled graphics VRM and VRAM temperatures. Mousepad engineering got something of an interesting sideshoot, for which we recruited engineers at Logitech for insight on mouse sensor interaction with surfaces.
More at the video below, or find our Patreon special here.
We moderate comments on a ~24~48 hour cycle. There will be some delay after submitting a comment.